Skyline was the only company capable of supplying over 150,000 square feet of suspended under deck access. The challenges were extreme, the weight of the system critical. It needed to be light weight, yet meet the requirements of access and environmental protection. The system also needed to be flexible enough to allow for the careful removal of large diameter water pipes from the underside of the bridge deck. Overall, this was one our most challenging projects.
Featured Products
Contact us about our industrial scaffold services or to request a proposal for your civil, commercial or industrial project in Vancouver or further afield.